Municipal program

Industrial Water Rate Program (Block 2 rate)

City of Toronto (Toronto Water)

OntarioWaterNo deadline stated

Not a grant but an ongoing ~30% discounted water/wastewater rate on industrial process water above 5,000 m3/year, in exchange for maintaining an approved water conservation plan.

What the program says

Amount
2026 Block 2 rate $3.3219/m3 vs. general rate $4.8629/m3 (~30% reduction) on consumption over 5,000 m3/yr
Deadline
No deadline stated on the source page
Level
Municipal
Region
Ontario
Utility
Water
Provider
City of Toronto (Toronto Water)

Status note, recorded at retrieval: Active; the required conservation plan and annual reporting are a natural fit for metering/monitoring services.

Every value below is quoted from the official page as it read on the retrieved date. Nothing is interpreted, converted or estimated (§F.3).

Who qualifies

Toronto manufacturers in the industrial property tax class using >5,000 m3/yr, compliant with the Sewers By-law, with an approved water conservation plan and annual progress reports (due July 1).

Eligibility is summarized from the official page and is not advice. The provider decides.

Where this came from

One official source, one date, one person accountable for the check.

Program details change. Always confirm with the provider before budgeting. If this page and the official page disagree, the official page is right — and we would like to know, at info@quantifyenv.com.

The application will ask what you use now.

Almost every program on this list wants a baseline and a projected saving. That is a measurement problem before it is a paperwork problem. We’ll walk your floor and tell you what is worth metering first — free, and without obligation.

Your first opportunity assessment is free.

Book a free consultationBack to the library