Case study

Over 450,000 litres saved in four months — and the clearest compressor graph we've produced

Compressed airWaterFood & Beverage ProcessingBulk Handling & Rail Logistics

>450,000 litres of water saved in four months, and the clearest before/after compressor graph we've ever produced.

PDI Bulk

Published with PDI Bulk’s permission, with the source of every figure printed below (G7).

Photo slot · case-pdi-compressor — pending the photography cull (§K.3 #27).

How it went.

Every study on this site runs the same four beats, in the same order.

  1. 01

    Alert

    Overnight water flow nobody could see, and a compressor cycling constantly to hold pressure in a leaking system.

  2. 02

    Cost

    >450,000 L in 4 months — Metering revealed overnight flow, leading to leak detection and process changes at one location.

  3. 03

    Fix

    Water metering on the incoming service and major consumers · Compressed-air header pressure and compressor runtime monitoring · Railcar temperature monitoring for in-transit QA/QC · Alerting on overnight baseline flow

  4. 04

    Restored

    Overnight flow stopped; compressor runtime down and header pressure stable

In full.

The problem

Two problems, one plant. Water was leaving the building overnight, and the air compressor was working far harder than the demand justified.

“At PDI, the compressor was running harder than it should have been — cycling constantly to maintain pressure in a system that was losing significant volume to undetected leaks…”

What we installed

Metering on the incoming water service and the major consumers, header pressure and runtime monitoring on the compressed-air system, and railcar temperature monitoring for in-transit QA/QC.

What the data showed

“Metering revealed overnight flow, leading to leak detection and process changes, saving over 450,000 litres of water over 4 months at one location.”

What changed

“We identified the losses, worked with the team to address them, and then watched what happened. The compressor runtime dropped. The pressure stabilized.”

The number

Over 450,000 litres of water, in four months, at one location. Source: NB Power RFP 0770-25-S510, Reference 1.

Also true

The work became a national rollout across eight facilities in Ontario, Alberta and Quebec.

What the data looked like.

Hover or arrow-key across the trace to read any interval. The flagged point is the one that started the conversation.

Over 450,000 litres saved in four months — and the clearest compressor graph we've produced
EXPECTED OVERNIGHT FLOORFirst shift on9 L/min, nobody on site≈ 5,500 L every night before anyone arrives
INCOMING WATER · ONE DAY · 30-MIN BUCKETS · DASHED = EXPECTED OVERNIGHT FLOOR
Chart data
IntervalIncoming service (L/min)
00:009
00:308
01:009
01:3010
02:0010
02:308
03:009
03:3010
04:0010
04:309
05:0010
05:309
06:0044
06:3046
07:0048
07:3051
08:0053
08:3052
09:0053
09:3053
10:0051
10:3051
11:0048
11:3048
12:0045
12:3043
13:0041
13:3040
14:0038
14:3036
15:0035
15:3036
16:0035
16:3037
17:0037
17:3040
18:009
18:309
19:0010
19:308
20:008
20:309
21:009
21:3010
22:009
22:3010
23:009
23:3010
Before and after, in words
BeforeOvernight flow running unseen; the compressor cycling constantly to maintain pressure
AfterOvernight flow stopped; compressor runtime down and header pressure stable
PDI Bulk — the second view
DEMAND ONLYWk 1: 145 h/weekWk 2: 146 h/weekWk 3: 148 h/weekWk 4: 148 h/weekWk 5: 98 h/weekWk 6: 96 h/weekWk 7: 97 h/weekWk 8: 97 h/week14514614814898969797
COMPRESSOR RUNTIME · EIGHT WEEKS · DASHED = DEMAND ONLY
Chart data
IntervalRuntime (h/week)
Wk 1145
Wk 2146
Wk 3148
Wk 4148
Wk 598
Wk 696
Wk 797
Wk 897

The published totals are the §H.1 figures. The interval shape is a representative reconstruction and is flagged as such in the dataset; the measured series drops into the same file under G6 with no markup change (§K.3 #28).

What changed.

Before

Overnight flow running unseen; the compressor cycling constantly to maintain pressure

After

Overnight flow stopped; compressor runtime down and header pressure stable

>450,000 L

in 4 months

Metering revealed overnight flow, leading to leak detection and process changes at one location.

Source: NB Power RFP 0770-25-S510 FINAL, Reference 1 (§H.1 claim 3)

In their words.

…immediate annual savings of over $150,000…

Jeff Inkes, General Manager, PDI Bulk

G2 — quoted verbatim from the archive. Where only a fragment is on file it renders as a fragment with its attribution; the middle is never invented. Full verbatim text required before launch — [TOM-REVIEW].

Find out what’s hiding in your plant.

Half a day on your floor, no charge and no obligation. At the end of it we tell you what we saw, what we would meter first, and what the return looks like.

Your first opportunity assessment is free.

Book a free consultationAll case studies

or call 1-833-QUANTFY (1-833-782-6839)